2010:Electrical Main 02.13
From 1511Wookiee
Jump to navigationJump to search
2.13.2010
Start time: 9:00am
End time: 9:00pm
Members present: Michael Hartman, Dave B., Tom Powers, Kevin Krech, Matthieu Dora
Tasks Completed:
- Mounted components on the Electrical Board
- Finished Electrical Board wiring (locally)
- Discovered that the cRIO decided to go on a diet.
Tasks to Complete:
- Update Jaguar Code
- BOM updated to the new format
- Make sensor wires
Materials Needed:
- None
Do not forget to add your needed items to the Shopping List!!
Images & Additional Updates:
(Use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size)