01.11.2009

Start time:10:00 am 

End time: 4:00 pm

Members present: Cuyler  ( Cuyler came in at noon and had to leave @ 3:30 ), Kyle Schuhart ( Kyle has to leave at 4)


Tasks Completed:

  • Confirmation of motors
  • Finished Drive Train (inventor braces that were not in original inventor file)



Tasks In Progress:

  • Frame work



Tasks to Complete:

  • Finish Frame work
  • Place electrical board in inventor file



Images & Additional Updates:

(Use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above.  Sizing can be done using the length/width pixel size)

Mechanical 2 update,

We have chosen what motors we are using for each mechanism,

For the Hopper:  The trapdoor and lower collection blocker will be powered by a denso window motor(part #: 262100-3040)

For the ball conveyor we will be using two Rs-545 Banebots Motors with 25:1 reduction gearboxes

And for the Upper ball ejector we will be using the Fischer Price Motor (part #: 00968-2910) along with an AndyMark 67:1 gearbox