2011:2011 Integration 1-22

From 1511Wookiee
Revision as of 11:20, 22 January 2011 by Programming (talk | contribs)
Jump to navigationJump to search

Drivetrain

Finalized frame rail dimensions.  Need to make sure Inventor measurements match actual wheel dimensions.  Will bolt and weld corner brockets.  Most motors are ready to mount.  Encoders are mounted to the transmission. 



Arm/Manipulator

.



Minibot/Deployer

.



Electrical Main

.



Electrical Controls

.



Programming

.