2009:Electrical 1.11.09
From 1511Wookiee
Jump to navigationJump to search
01.11.2009
Start time: 11
End time:
Members present: Rika, Michael, Crystal, Dave, Karen, Victor
Tasks Completed:
- Finished Electrical Mock board with 4 Victors
- Converted CIM motors to PWM connetions
- Encoded CIMs
- Tested out electronics as far as the victors go to power the drivetrain--SUCCESS!
Tasks In Progress:
- Assembly on drivetrain
- Battery charging ^_~
Tasks to Complete:
- task
- task
Images & Additional Updates:
(Use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size)