2011:Mechanical 2 1.30
From 1511Wookiee
Jump to navigationJump to search
Attendance
Start time: 11
End time:
Members present: Alex W., Mr. W., Mr. K., Briana M
Members Attending Next Meeting:
Tasks Completed
- Drawings of parts for arm
- sub-task
- sub-task
- task
Tasks In Progress
The Robot Frame Requirements include supporting (or interacting with) the following components;
1 shoulder DONE
2 shoulder motor DONE
3 drive train transmissions N/A
4 bumpers
5 tusk pivot
6 tusk stops
7 protective skins
8 electrical board? N/A
9 deployment mechanism
10 limit arm travel with a mechanical stop
11 Arm capture / release mechanism
12 arm travel limited by sensor
13 camera
14 yellow light
15 want it light
=
Not included;
1. electronic “belly pan”
2. battery case
3. main power switch
4. line following sensors
Materials Needed
Materials Needed
=
- task
- sub-task
- sub-task
- task