2011:Electrical Main 2.13
From 1511Wookiee
Jump to navigationJump to search
Attendance
Start time:
End time:
Members present: Ciana, Vaughn, Dave B., Dave S.,
Members Attending Next Meeting:
Tasks Completed
- roughed in wires for arm
- attached side board mounts to the tower superstructure
- mounted 3 extra LED's on mosfet control board to give local display of line sensors (ultimately these must connect to black wires from the line sensors)