2011:Check Lists
From 1511Wookiee
Jump to navigationJump to search
Pre-Match Check List
- Main Bot
- Properly park arm
- Place Uber tube in fully
- Attach velcro to manipulator
- Push Uber tube towards arm
- For line following: only sensor must be green
- Align robot will pegs and perpendicular to wall
- Make sure side plastic panels are not in the way of the draw bridge
- Pull out BOTH safety pins
To be added: Power on, alignment details, and gyro interaction
- Mini Bot
- TBD: put in info about the switch positions
- Controls
- Select Autonomous Mode (press A)
- Select Autonomous Delay (turn dial)
- Check broken switches
Post-Match Check List
- Push deployer back in so latch catches
- Put in deployer's saftey pin
- Pull up draw bridge
- Put in draw bridge's safety pin
- Park arm and manipulator
Pit Check List
- Setup Mini-bot (see Pre-Match Check List)
- Follow Post-Match Check list
- Put in BOTH safety pins