2012:Controls 01.28

From 1511Wookiee
Revision as of 19:08, 28 January 2012 by ElectricalControls (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigationJump to search

Attendance

Start time: 10AM

End time: 9PM

Members present: Alex, Ethan, Justin, Eric, Gafei 

Members Attending Next Meeting:

Tasks Completed

  • Completed premilinary mechanical drawing in inventor.
  • Updated controls list with additional parts.

Tasks In Progress

  • Peformed Freedom towering control programming
  • Peformed additional dashboard programming.

Tasks to Complete

  • Model prototype drawing into a prototype metal chassis.

Materials Needed

  • Wires, switches, buttons.