2013:Electrical Controls 01.26

From 1511Wookiee
Revision as of 19:02, 26 January 2013 by ElectricalControls (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigationJump to search

Attendance

Start time: 10:00 am

End time: ??

Members present: Shayna R., Nick B., Eric A., Gafei S., Vlad B., Matt B., Kyle

Members Attending Next Meeting: ??

Tasks In Progress

  • Define functionality on control functions.
  • Verify current 3D model dimensions.
  • Verify 3D model positions.  
  • Design dimensions for strap buckle on back side.
  • Work with programming on dashboard interface.

Tasks to Complete

  • Finish 3D model of controls in inventor.
  • Post all needed parts on the team google doc. page
  • Figure out control board (teensy?) selection.
  • Map CONTROLS in a list.

Materials Needed

  • Refer to the team google doc. or the BOM