2009:Electrical Main 1.27.09

From 1511Wookiee
Revision as of 17:45, 27 January 2009 by ElectricalMain (talk | contribs)
Jump to navigationJump to search

1.27.2009

Start time: 6:30

End time:

Members present: Mike, Crystal, Rika, Collin, Apples, Oranges


Tasks Completed:

  • more updates to the BOM
  • Side electrical board is in main robot design in inventor
  • cut Lexan for side electrical board



Tasks In Progress:

  • design and fabricate battery box
  • keep updating BOM



Tasks to Complete:

  • measure and fabricate cRIO mounting plate
  • task