2.7.09

Start time:

End time:

Members present:


Goals:

-Get everything mounted onto the lexan - AKA Victors, Distribution block, wireless bridge

-Measure out wires and begin cutting, arranging and assembling if possible - Do we have the wires?

-Work on making that lexan cover, is it done in inventor with the hinges? Do we even HAVE that lexan yet?

-Update Bill of Materials with purchased wires, all the other stuff Crystal can't think of right now lolz.