2009:Controls20709

From 1511Wookiee
Revision as of 17:10, 8 February 2009 by ElectricalControls (talk | contribs)
Jump to navigationJump to search

 02.08.2009

Start time: 10:00 am
End time: 8:00 Pm

Members present: Nic , Alex, Eric A, Victor
Tasks Completed:
1.Part of board was wired.
2.Lights were tested.

Tasks to Complete:
1. The board still needs to be wired.

2. Put redboard