2010:Drivetrain

From 1511Wookiee
Revision as of 17:05, 7 January 2009 by Drivetrain (talk | contribs)
Jump to navigationJump to search

This is the Drivetrain Subteam's Engineering Notebook

1.07.2009

Start time: 6:00 pm

End time:  9:00 pm

Members present: Tony,  Goodman, Gannon, Larry, Dora

New bearings p/n r1212zz ordered.

Tony and Matt were show  drive wheel asembly.


Tasks to complete: '

1.07.2009

Start time: 

End time:

Members present: Tony, Brenton, Goodman, Mark, Gannon, Larry


All, please use the files in your assembly.

I'll have to mail them *.stp is not allowed as to be uploaded by Wiki.


Tasks to complete:

1. Gather CAD files for inventor.
2. Assemble parts in inventor USE DATUMS
3. Make Drawings for custom parts
4. Make *.stp files for custom parts
5. Itemizes issues that need to be addressed
6. Become familiar with the design and Order of assembly
7. Figure out needed hardware. YOU ARE NOT LIMETED TO BOLTS AND NUTS



1. Gather CAD files for inventor.
2. Assemble parts in inventor USE DATUMS01.
3. Make Drawings for custom parts
4. Make *.stp files for custom parts
5. Itemizes issues that need to be addressed
6. Become familiar with the design and Order of assembly
7. Figure out needed hardware. YOU ARE NOT LIMETED TO BOLTS AND NUTS