2009:Mechanical 2 1.7.2009

From 1511Wookiee
Revision as of 18:27, 7 January 2009 by Mechanical2 (talk | contribs) (New page: Tasks completed: <br>- Worked with Drive Train to conclude to determine the spacing for collection.<br>- Changed design of the robot created last night. It consists now of 2 rollers, the...)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigationJump to search

Tasks completed: 
- Worked with Drive Train to conclude to determine the spacing for collection.
- Changed design of the robot created last night. It consists now of 2 rollers, the front roller bringing in balls into a 1x2 hopper (holds about 16 balls). There is a conveyor system in the front which brings the balls up to a top where we were talking about having a curved deflector plate and have the conveyor belts shoot the balls. We haven't excluded the idea of the roller kicking the balls out the front.
- Started inventor work with simple shapes that take up the space they represent to better understand the layout of available space.

-Finish available space analysis