2010:Drivetrain 01.13

From 1511Wookiee
Revision as of 16:44, 13 January 2010 by Drivetrain (talk | contribs)
Jump to navigationJump to search

1. Names of the people that attended  Tresten.R  Lizzy.M  Matt.M Ben.S Graeme.B  Josh.Gannon

2. DATE & Start & Stop Time 6:40

3. Tasks accomplished

  • Updated BOM
  • Parts ordered:
  1. Motor mounts
  2. Chassis brackets
  3. Bearing blocks
  4. Cross brace
  5. Wheels, traction, 8 inch (2)
  6. Gearbox (12:1)
  7. Hubs
  8. Encoders

4. Tasks in process

  • Drivetrain details
  • Custom wheel design

5. Tasks to complete tomorrow

  • Order key stock (0.125 keyway)
  • Fasteners: determine BOM and order

6. Names of people attending tomorrow :Tresten.R Lizzy.M Matt.M Gaeme.B Ben.S

7. Materials are needed to work

  • Build bumpers
  • Assemble motor/mount/encoder/gearbox
  • Install bearings and bearing blocks
  • Design bumper mounts
  • Design wheel protectors
  • Investigate more elegant motor/transmission/gearbox/bearing block/encoder mount


Pictures

Isometric View:

[[2010 drive b useme.jpg

Bottom View:

2010 drive b useme3.jpg

Top View:

2010 drive b useme5.jpg

Front View:

2010 drive b useme6.jpg