2010:Controls 01.20
From 1511Wookiee
Jump to navigationJump to search
01.20.2010
Start time: 18:30
End time:
Members present: Crystal, Quintin, Rachel, Fellows
Members Attending Next Meeting: Crystal
Tasks Completed:
- Mock controls completed and mounted on plywood
- Mock controls tested for connection: affirmative
Tasks In Progress:
Tasks to Complete:
Materials Needed:
- Buttons ordered
- CAD Model design fabricated
Do not forget to add your needed items to the Shopping List!!
Images & Additional Updates:
(Use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size)