2010:Drivetrain 01.19
From 1511Wookiee
Jump to navigationJump to search
XX.XX.2010
Start time: 6:54
End time:
Members present: Tresten.R Lizzy.M Graeme.B Matt.M Ben.S Alex.R
Members Attending Next Meeting: Josh.G
Tasks Completed:
- task
- task
Tasks In Progress:
- Brainstorming articulating side ball gaurds
- Brainstorming wheel gaurds
Tasks to Complete:
- Design wheel gaurds
- Design articulating side ball gaurds
- Order new drive train metal work
- Chassis brachets (8), motor mounts (4), front skid gaurds (2), rear skid guard (1)
Materials Needed:
- item
- item
Do not forget to add your needed items to the Shopping List!!
Images & Additional Updates:
(Use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size)