2010:Electrical Main 02.07
From 1511Wookiee
Jump to navigationJump to search
02.07.2010
Start time: 11am
End time:
Members present: Mike Hartman, Crystal, Karen F., Dave S. - NOTE Combined Controls & Main meeting
Members Attending Next Meeting:
Tasks Completed:
- Mike worked on wiring the Electrical control board.
- estimated lengths of hardware (machine bolts) we will need to attach electrical components to new board - found some of them in the stock we have.
- put PWM cable on one of the 10-turn pots we are using for the lifting winch sensor.
- found our stash of servos
Tasks In Progress:
- task
- task
Tasks to Complete:
- build electrical board
- task
Materials Needed:
- item
- item
Do not forget to add your needed items to the Shopping List!!
Images & Additional Updates:
(Make sure you are in the Rich Editor and use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size)