2010:Mechanical 2 02.14

From 1511Wookiee
Revision as of 08:29, 16 February 2010 by Mechanical1 (talk | contribs) (New page: note from 2/14 - Tom C. Some hard fought progress – we had it back together and kicking last night. Main assembly is bolted to frame, main front overhead support is drilled and bolted. ...)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigationJump to search

note from 2/14 - Tom C.

Some hard fought progress – we had it back together and kicking last night. Main assembly is bolted to frame, main front overhead support is drilled and bolted. Chain is on the unit. Replacement pan for window motors was slotted for adjustment and painted?. Need to swap out at some point. Rear legs need to have plugs inserted and spotted and drilled / threaded to the frame. Also need to attach safety cable – we have all the hardware – minor fitting required. I will be bringing in clamps and alternate rubber parts options.


I am picking up two band saw blades at Lowes this noon hour – there are 3 details Mike gave me late last night. Two 1/8 sheet metal pieces, one block – could be Aluminum or nylon – drawings are on our shelf – face up.