2009:Electrical Meeting 11.12
From 1511Wookiee
Jump to navigationJump to search
Attendance: Tom, Tommy, Kevin, Vaughn, Matthieu, Mike (Packing), Crystal (Packing), Dave B
General
First meeting in A10... About a million times better than last week!
Progress
- Found and connected robot radio
- Verified shooter works
- Verified left side of DT works
Plans
- Right hand DT does not work... Possible problems:
+Joystick on control is not properly hooked up
+Code does not match pinmap
+I/O port is dead (never seen this)
- Conveyor system is not working...
+Lots seems wrong...
+Controls has a broken switch... let's replace it!
+Need a control line to the Robot Controller