2009:Field/Crate 1.18.09

From 1511Wookiee
Revision as of 11:05, 19 January 2009 by Leadership (talk | contribs) (added orbit ball notes)
Jump to navigationJump to search

1/18/09

People Present: Theo

Time Started: 10:00 am

Time Ended: 4:00 pm


Tasks Completed:

1.) Trailers strengthened

2.) Wood storage organized

3.) Started work on airlocks


Tasks to Complete:

1.) Airlocks

2.) Outposts

3.) Alliance Station Walls


Orbit Ball Notes

- All Plexi pieces have been cut, sanded, and filed down (Thanks Tom, Cynette, Sharon & Ted)

- Tony D & Tony B created a fixture to create & drill the holes for the orbit ball plexi pieces

- Over half of the pieces have now been drilled with holes

TO DO:

- finish drilling holes

- cut batting for spandex

- cut camo spandex

- create "sample" ball

(Need to get red/white/black spandex in, buy 1/8" rivets)