2011:Mechanical 2 2.5

From 1511Wookiee
Revision as of 17:27, 5 February 2011 by Mechanical2 (talk | contribs)
Jump to navigationJump to search

Attendance

Start time:

End time:

Members present:

Members Attending Next Meeting:

Tasks Completed

  • task
    • sub-task
    • sub-task
  • task

Tasks In Progress

  • arm park sensor,  when parked it's blocked.
  • 2 playing position over travel sensors,  goes blocked when arm is too low.
  • task

Tasks to Complete


1  Do we have a sprocket guard figured out yet for the top of the arm?
---Saftey in never second to anything, but guard designs often require a hands on approach and should be mostly simple parts we can make.
4  We need to finalize the release mechanism for the deployer.!!!!!!!!!!!!!!!!!!!!

5   We don’t have a final design for the tusks or how they will be deployed yet.

7 Have we considered a interchangeable deployer plate so that we can accommodate other Minibots?

4Deployer park side side shield A   ALEX done
5 Deployer park side side shield B  ALEX done
6 Drawbridge TOM
7 Side electrical board supports, and place board CIANNA
8 Belly pan

sensor brackets and flags 3

arm release trigger

parts inventory

encoder on the jack shaft

jack shaft details

ASSEMBLE

put in electrical components and weight cg work.CIANNA

MINI BOT HOLDER

Light tower mount.


Materials Needed

ORDER BELT