2011:Mechanical 2 2.6

From 1511Wookiee
Revision as of 10:30, 6 February 2011 by Mechanical2 (talk | contribs)
Jump to navigationJump to search

Attendance

Start time:

End time:

Members present:Brianna, Ciana, Alex, Mr Kanzler, Mr Wolf

Members Attending Next Meeting:

Tasks Completed

  • task
    • sub-task
    • sub-task
  • task

Tasks In Progress

- Do we have a sprocket guard figured out yet for the top of the arm?
- Saftey in never second to anything, but guard designs often require a hands on approach and should be mostly simple parts we can make.
5- We need to finalize the release mechanism for the deployer.!!!!!!!!!!!!!!!!!!!!

- Deployer park side side shield A ALEX  needs drawing
- Deployer park side side shield B ALEX needs drawing

- Drawbridge TOM / Alex

      Dust pan deploy
- Side electrical board supports, and place board CIANNA
- Belly pan

1- sensor brackets and flags 3 Brianna

- arm release trigger

- parts inventory

2- jack shaft details

       encoder on the jack shaft

- ASSEMBLE

- put in electrical components and weight cg work.CIANNA

3- MINI BOT HOLDER

4- Light tower mount.  Gabe

- Deploy side deployer mount sheet metal

- dust pan


Tasks to Complete

  • task
    • sub-task
    • sub-task
  • task

Materials Needed

  • task
    • sub-task
    • sub-task
  • task