2009:Electrical 1.15.09

From 1511Wookiee
Revision as of 17:39, 15 January 2009 by ElectricalMain (talk | contribs)
Jump to navigationJump to search

01.15.2009

Start time: 7

End time: 9

Members present: Rika, Crystal, Sean, Michael, Josh, Oranges, Apples


Tasks Completed:

  • Tested bright light interferance with Omron Sensors.
  • Determined that hopefully two omrons will go on both ends of the converyors



Tasks In Progress:

  • task
  • task



Tasks to Complete/Things we want to know:

  • Do we want six photoelectric sensors
  • task



Images & Additional Updates:

(Use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above.  Sizing can be done using the length/width pixel size)



Electrical Main Main Page