2013:Climber 01.26

From 1511Wookiee
Revision as of 13:01, 26 January 2013 by Mechanical1 (talk | contribs)
Jump to navigationJump to search

Attendance

Start time:

End time:

Members present:

Members Attending Next Meeting:

Tasks Completed

  • task
    • sub-task
    • sub-task
  • task

Tasks In Progress

  • task
    • sub-task
    • sub-task
  • task

Tasks to Complete

Release all fab parts 1/24/13

list and order all assembly hardware

DONE-   check 54 inch cyl

Alex-   Design Black arm pivot

Alex-   Put in battery

Design release mechanism for red arms and black arms

Design restraining mechanism for red arms and black arms

Brianna-   Add sensors to model

Brianna-   Design the cross member with leg guide for Red arms and Black arms

Add lightening holes all over the place

Order all purchase parts

Combine all subteams parts and design the CG to be within +/- one inch from bot centerline

Use cross members to strengthen the elevator shafts

Belay attachment points

Revise part #002 with "far side" note

Redesign 002 elevator C chanel to accomodate "new" pyramid

ON HOLD - transmission chain tentioner

 

 

Materials Needed

  • task
    • sub-task
    • sub-task
  • task