2014:Integration
From 1511Wookiee
Jump to navigationJump to search
To Do
- Finish primary chassis
- Paint
- Instal Wheels
- Instal transmitions
- Add chains
- Add Circuit Plank
- Wire It up
- Add code
- Mock up drive station
- Finish CAD model
- Finish Secondary chassis
- Finish L brackets
- Assemble
- Add Wheels
- Add Transmitions
- Add chains
- Add Circuit Plank
- Wire It up
- Download Code
- Fake Driver Station
Goals
- Make substantial progress on the CAD model(s) of the robot (by Tuesday 1/13 integration meeting at 6:30)
- Assemble the second chassis (by Tuesday 1/13 integration meeting at 6:30)
- Prepare primary chassis
- Build transmissions
- Finish primary drivetrain
- Finish secondary drivetrain
Completed Goals
- NONE
Drivetrain Design Specifications
- 27" long * 28" wide aluminum c-channel chassis
Ideas For Changes
- NONE
Equipment Requirements/Size
- -Weight
Unknown
- -Cim motors
-4
Impact
- Weight remaining
Unknown
- Cim motors remaining
2
Sub-Team Mentors
-Fill in here
Student Members
- Fill in names
-And sub-team (electric, mechanical, etc.)
- Raymond Healy
Programming