2009:Mechanical 1 - 1.21.09
From 1511Wookiee
Jump to navigationJump to search
1.21.2009
Start time:6:00
End time:9:00-
Members present:Alex Wolf, Mike Wolf, Dave Vadas
Tasks Completed:
- Refined frame details
* Added outrigger frame support near lower plucker, tying the chassis outside members per Josh Gannon's suggestion
- Added intermediat support also tying the chassis outside members per Josh Gannon's suggestion
- Designed new bracket to accomidate the trap door drive
- Designed brackets for conveyor drive motors and added to the assembly
- Completed design of actuated mechanism
Tasks to Complete:
- Continue to refine frame design
* task
Images & Additional Updates:
(Use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size)