2009:Electrical Main 2.5.09

From 1511Wookiee
Revision as of 16:05, 5 February 2009 by ElectricalMain (talk | contribs) (New page: 2.5.2009 Start time: 6:40pm End time: 9pm<br> Members present: Michael H, Sean K, Rika L, Crystal V, Apples, Oranges <br> ---- <br> <u>'''Burlone's Marching Orders of the Night:'''...)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigationJump to search

2.5.2009

Start time: 6:40pm

End time: 9pm

Members present: Michael H, Sean K, Rika L, Crystal V, Apples, Oranges




Burlone's Marching Orders of the Night:(¬O_o)¬

1. Battery Box - Rika/Cuyler

2. Remount Electrical (Saturday) -- Group

3. Terminate / Leave one end long (6 AGW wires should be soldered) (i.e Speed controllers, cRIO)

    -PWM cabled will be used from kit, any other long lengths will be custom terminated.

Banner Sensor Configuration:

Put gother a wiring harness and use 7100's as an example - Sillyscope

4. Continue velcroing the board -- Group

5. Create Battery strap - Rika

6. Mouse Encoders - Mike and Crystal

7. Lexan Board Cover - Mike, Collin, Rika, Crystal, Sean