2.5.2009

Start time: 6:40pm

End time: 9pm

Members present: Michael H, Sean K, Rika L, Crystal V, Apples, Oranges




Burlone's Marching Orders of the Night:(¬O_o)¬

1. Battery Box - Rika/Cuyler

2. Remount Electrical (Saturday) -- Group

3. Terminate / Leave one end long (6 AGW wires should be soldered) (i.e Speed controllers, cRIO)

    -PWM cabled will be used from kit, any other long lengths will be custom terminated.

Banner Sensor Configuration:

Put together a wiring harness and use 7100's as an example - Sillyscope

4. Continue velcroing the board -- Group

5. Create Battery strap - Rika

6. Mouse Encoders - Mike and Crystal

7. Lexan Board Cover - Mike, Collin, Rika, Crystal, Sean


Stuff in the Process

-Schope is looking for sketmatics for our banner sensors

-Dave and Josh are working on measuring out wiring in inventor

-Rika and Cuyler are collaborating about the battery box

-Mike and Crystal will be in the shop working on the board, velcroing, prepping wires, ect.

Completed

-Banner Sensor Schematic (h/t Oranges and Sean)

Banner Sensor (Cause It's Special)















-Initial Wiring Diagrams

Mostly Mechanisms
Power Dist. and Drive