2009:Electrical Main 2.7.09
From 1511Wookiee
Jump to navigationJump to search
2.7.09
Start time:
End time:
Members present:
Goals:
-Get everything mounted onto the lexan - AKA Victors, Distribution block, wireless bridge
-Measure out wires and begin cutting, arranging and assembling if possible - Do we have the wires?
-Work on making that lexan cover, is it done in inventor with the hinges? Do we even HAVE that lexan yet?
-Update Bill of Materials with purchased wires, all the other stuff Crystal can't think of right now lolz.