1.07.2009
Start time: 6:00 pm
End time: 9:00 pm
Members present: Tony, Goodman, Gannon, Larry, Dora
New bearings p/n r1212zz ordered.
Tony and Matt were show drive wheel asembly.
ordered transmission
built up chassis frame
Tasks to complete: '
Start time:
End time:
Members present: Tony, Brenton, Goodman, Mark, Gannon, Larry
All, please use the files in your assembly.
I'll have to mail them *.stp is not allowed as to be uploaded by Wiki.
Tasks to complete:
1. Gather CAD files for inventor.
2. Assemble parts in inventor USE DATUMS
3. Make Drawings for custom parts
4. Make *.stp files for custom parts
5. Itemizes issues that need to be addressed
6. Become familiar with the design and Order of assembly
7. Figure out needed hardware. YOU ARE NOT LIMETED TO BOLTS AND NUTS
1. Gather CAD files for inventor.
2. Assemble parts in inventor USE DATUMS01.
3. Make Drawings for custom parts
4. Make *.stp files for custom parts
5. Itemizes issues that need to be addressed
6. Become familiar with the design and Order of assembly
7. Figure out needed hardware. YOU ARE NOT LIMETED TO BOLTS AND NUTS