2010:Drivetrain 01.13
From 1511Wookiee
Jump to navigationJump to search
1. Names of the people that attended Tresten.R Lizzy.M Matt.M Ben.S Graeme.B Josh.Gannon
2. DATE & Start & Stop Time 6:40
3. Tasks accomplished
- Updated BOM
- Parts ordered:
- Motor mounts
- Chassis brackets
- Bearing blocks
- Cross brace
- Wheels, traction, 8 inch (2)
- Gearbox (12:1)
- Hubs
- Encoders
4. Tasks in process
- Drivetrain details
- Custom wheel design
5. Tasks to complete tomorrow
- Order key stock (0.125 keyway)
- Fasteners: determine BOM and order
6. Names of people attending tomorrow :Tresten.R Lizzy.M Matt.M Gaeme.B Ben.S
7. Materials are needed to work
- Build bumpers
- Assemble motor/mount/encoder/gearbox
- Install bearings and bearing blocks
- Design bumper mounts
- Design wheel protectors
- Investigate more elegant motor/transmission/gearbox/bearing block/encoder mount
Pictures
Isometric View:
Bottom View:
Top View:
Front View: