2010:Controls 01.20

From 1511Wookiee
Revision as of 17:08, 21 January 2010 by ElectricalControls (talk | contribs)
Jump to navigationJump to search

 01.20.2010

Start time: 18:30

End time:

Members present: Crystal, Quintin, Rachel, Fellows

Members Attending Next Meeting: Crystal


Tasks Completed:

  • Mock controls completed and mounted on plywood
  • Mock controls tested for connection: affirmative



Tasks In Progress:



Tasks to Complete:




Materials Needed:

  • Buttons ordered
  • CAD Model design fabricated

Do not forget to add your needed items to the Shopping List!!


Images & Additional Updates:

(Use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above.  Sizing can be done using the length/width pixel size)