2010:Mechanical 2 01.21
From 1511Wookiee
Jump to navigationJump to search
XX.XX.2010
Start time: 6:45 PM
End time:
Members present: Alex Wolf, Mike Montemalo, Vaun Thompson,
Members Attending Next Meeting: Mike M...
Tasks Completed:
- attached the electrical bord to the left side of the bot.
- We attached a wormdrive gearbox to the rear of the bot to power the kicking mechanism.
- We changed the superstructure rear frame and ridgidized it to compensate for the wormdrive gearbox.
Tasks In Progress:
- attaching a mount to hold the battery
- working on connecting all parts of the kicking mechanism (belt, gearbox, etc.)
Tasks to Complete:
- We need to finish and test the two position shooter
- We need to put all known parts on Inventer.
- task
Materials Needed:
- N/A
- item
Do not forget to add your needed items to the Shopping List!!
Images & Additional Updates:
(Use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size)