2010:FieldCrate 01:21

From 1511Wookiee
Revision as of 10:39, 22 January 2010 by FieldCrate (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigationJump to search

01.21.2010

Start time: 7:00

End time: 9:00

Members present: Theo, Amy

Members Attending Next Meeting: Theo, Jason, Amy


Tasks Completed:

  • Moved bumps and 1 platform into storage container
  • Assembled corral for testing goal
  • Fixed top plate on platform
  • Researched impact of arena updates



Tasks In Progress:

  • Bumps
  • Towers



Tasks to Complete:

  • Ball Returns



Materials Needed:

  • Ball return pipes

Do not forget to add your needed items to the Shopping List!!


Images & Additional Updates:

(Use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above.  Sizing can be done using the length/width pixel size)