2010:Electrical Main 01.24
From 1511Wookiee
Jump to navigationJump to search
1.24.2010
Start time: 10:00
End time:
Members present: Michael Hartman, Vaughn Thompson, Dave B.
Tasks Completed:
- checked the pneumatics breakout "bumper" board documentation and verified that we only need to supply it with +12V from the circuit breaker panel. It has its own onboard voltage regulator to generate the +24V that the pneumatics require (Dave S)
- task
Tasks to Complete:
- BOM
- Shopping List
Materials Needed:
- item
- item
Do not forget to add your needed items to the Shopping List!!
Images & Additional Updates:
(Use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size)
Jaguar- http://ordering.digikey.com/Promotions/FirstRoboticsCompetition.aspx
Victor - http://www.vexrobotics.com/products/vexpro/victor-speed-controller.html