2010:Drivetrain 02.02

From 1511Wookiee
Revision as of 07:19, 3 February 2010 by Drivetrain (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigationJump to search

02.02.2010

Start time:5:00

End time:9:00

Members present:Gannon, Ben, Lizzy, Alex, Matt

Members Attending Next Meeting:

Tasks Completed:

  • task
    Main drivetrain buid


Tasks In Progress:

  • task
    Need to install Ball and wheel gaurds mount and gaurds


Tasks to Complete:

  • Bumpers


Materials Needed:

  •   bumper materials



Do not forget to add your needed items to the Shopping List!!

Images & Additional Updates:

(Make sure you are in the Rich Editor and use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size)

Test Engineering Notebook Template