2010:Electrical Main 02.04

From 1511Wookiee
Revision as of 17:52, 4 February 2010 by ElectricalControls (talk | contribs)
Jump to navigationJump to search

02.04.2010

Start time: 5:30PM

End time: 9PM

Members present: Mike H, Dave, Vaughn, Kevin, Tom, Matthieu

Members Attending Next Meeting:


Tasks Completed:

  • selected the sensor for the lifting winch to be a multiturn potentiometer - we have several already



Tasks In Progress:

  • Order spare connectors



Tasks to Complete:



Materials Needed:

  • Spare Connectors of all sizes

Do not forget to add your needed items to the Shopping List!!


Images & Additional Updates:

(Make sure you are in the Rich Editor and use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above.  Sizing can be done using the length/width pixel size)