2010:Drivetrain 02.04

From 1511Wookiee
Revision as of 12:13, 5 February 2010 by Drivetrain (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigationJump to search

02.04.2010

Start time:6:30

End time:

Members present: Alex R. Ben S. Matt M. Lizzy

Members Attending Next Meeting:

Tasks Completed:

  • Basic assemble complete
  • Electrical board screwed on and hooked up
  • Handed over to programming


Tasks In Progress:

  • n/a - Ben is helping with controls, Lizzy, Alex, and Tom Cavaliere are inventorying new parts, and Matt is updating the wiki.


Tasks to Complete:

  • Get the robot back
  • Final assembly - still waiting on ball guard


Materials Needed:

  • The last few parts

Do not forget to add your needed items to the Shopping List!!

Images & Additional Updates:

(Make sure you are in the Rich Editor and use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size)

Test Engineering Notebook Template

2010 drive cl1.jpg

2010 drive cl2.jpg

2010 drive cl3.jpg