Start: 9:00AM

End: 9:00PM\

Mike M., Alex W., Jake K



-We woeked more on inventor, we updadated the Bill of Materals and shipped 80% of the needed stuff to Harris.

-Finished th Beater Bar (Thrasher Bar) and the front ball stopper that uses two bended pieces of sheet metal and a lexan pannel.

-Continued to work in detailing the BOM and getting everything for the following week

-We have set up a work shop date with VanBortal supply (IKEs Workshop) on Monday.