2010:Mechanical 2 02.06

From 1511Wookiee
Revision as of 17:34, 6 February 2010 by Programming (talk | contribs) (New page: Start: 9:00AM End: 9:00PM\ Mike M., Alex W., Jake K -We woeked more on inventor, we updadated the Bill of Materals and shipped 80% of the needed stuff to Harris. -Finished th ...)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigationJump to search

Start: 9:00AM

End: 9:00PM\

Mike M., Alex W., Jake K



-We woeked more on inventor, we updadated the Bill of Materals and shipped 80% of the needed stuff to Harris.

-Finished th Beater Bar (Thrasher Bar) and the front ball stopper that uses two bended pieces of sheet metal and a lexan pannel.

-Continued to work in detailing the BOM and getting everything for the following week

-We have set up a work shop date with VanBortal supply (IKEs Workshop) on Monday.