2010:FieldCrate 02:06
From 1511Wookiee
Jump to navigationJump to search
02.06.2010
Start time: 9:00
End time: 9:00
Members present: Jason, Theo, Amy, Kevin
Members Attending Next Meeting: not sure
Tasks Completed:
- carpeted bumps
- carpeted goal ramps
- assembled towers and painted towers and platforms
- painted insides of goals
- assembled base structure of ball returns
- rolled out field carpet to check for damage
Tasks In Progress:
- ball returns
Tasks to Complete:
- attach velcro
- cut netting for sides of goals
- re-print visions targets
- paint 1511 on side of crate
- determine final connections of field elements to walls and rails
Materials Needed:
- item
Do not forget to add your needed items to the Shopping List!!
Images & Additional Updates:
(Make sure you are in the Rich Editor and use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size)