2010:FieldCrate 02:14

From 1511Wookiee
Revision as of 18:33, 14 February 2010 by FieldCrate (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigationJump to search

02.14.2010

Start time: 12:00pm

End time: 5:30pm

Members present: Jason, Theo, Amy

Members Attending Next Meeting: Theo, Amy


Tasks Completed:

  • mounted both ball returns
  • determined how to integrate goals
  • tested the ball return and trident (they work really well)



Tasks In Progress:

  • back frame for vision targets
  • modifying goals
  • mounting chains
  • mounting soccer netting
  • moving everything into the gym
  • re-assemblying for rally



Tasks to Complete:

  • task



Materials Needed:

  • item


Do not forget to add your needed items to the Shopping List!!

Images & Additional Updates:

(Make sure you are in the Rich Editor and use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size)