2010:Electrical Main 02.015

From 1511Wookiee
Revision as of 07:33, 16 February 2010 by ElectricalMain (talk | contribs) (progress/plans)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigationJump to search

 2/16/2010

Present:  Vaughn, Mike, Dean, Dave B.


Progress

  • Roughed in Wheel Encoder PWMs
  • Roughed in Thrasher Power Lines
  • Roughed in Magnetic Sensor PWM
  • Roughed in Kicker Pullback Power Lines


Plans

    • Rough in Servo PWMs (Camera and Lifter)
  • Rough in electromagnet Power Lines
  • Add insulation to C-Channel so as not to destroy wires when pulling through
  • Repair Left Rear Encoder PWM

Dependencies