2009:Field/Crate 1.10.09

From 1511Wookiee
Revision as of 13:38, 14 November 2010 by Heydowns (talk | contribs) (Field/Crate 1.10.09 moved to 2009:Field/Crate 1.10.09)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigationJump to search

1.10.2009

Start time: 10:00


End time: 8:00


Members present: Amy, Theo, Karen


Tasks completed:

1.) Cut remaining pvc holes in trailer bases


2.) Cut out plywood for bumpers


3.) Cut out large hole in center of each base


4.) Bought 20 sheets of "Regolith" flooring (it is being stored in the autoshop with the overpass and regular floor boards)


5.) created template for attaching bumper plywood to mounting pieces


Tasks to complete:

1.) Attach bumper plywood to mounting pieces


2.) Cut slots for wheel in bottom bases


3.) Cut plywood/polycarbonate for vision targets


4.) Glue/assemble trailers