2009:Field/Crate 2.11.09

From 1511Wookiee
Revision as of 13:38, 14 November 2010 by Heydowns (talk | contribs) (Field/Crate 2.11.09 moved to 2009:Field/Crate 2.11.09)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigationJump to search

2/11/09


No Work Completed.

Tasks Still to do:

1. Finish painting crates (ours needs some new paint where the plywood was replaced)
2. Fabric for vision targets -> complete them & install
3. Assemble alliance station walls
4. Buy/cut plywood for bottom of alliance station walls
5. Outposts- What do we want to do- lexan? the seat?
6. Buy any addition Regolith needed
7. Buy hardware needed for cross braces on crates