2011:Mechanical 2 1.15

From 1511Wookiee
Revision as of 15:58, 16 January 2011 by Mechanical2 (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigationJump to search

Attendance

Start time: 6:00

End time: 9:30

Date: 1/14/11

Members present:

Brianna M.

Ciana R.

Alex W.

Mr. W

Mrs. W

Members Attending Next Meeting:

Brianna M.

Ciana R.

Alex W

Mr. W

Mrs. W

Mr. K.

Tasks Completed

  • Determined length and angle of gripper   
  • 1st test 
  •       A: 8" (no) 7"(no) 6" ( worked poorly, and we had to push the tube in)
  •       B: 8"
  •       D: 2"
  • 2nd test:
  •       A: 8"(no) 7"(no) 6"(worked poorly, and we had to push the tube in)
  •      B: 10"
  •      D: 2"
  • Finshed game peices on inventor  
  • 0114012040.jpg

0114012118.jpg

Tasks In Progress

  • tubbing or not
  • manipulator prototyping  
  • sketching manipulators

Tasks to Complete

  • tbd

Materials Needed

  • tbd

DAY 2: 1/15/11

Attendance

Start time: 11:00 am

End time:  9:00 p.m.

Members present:

Brianna M.

Ciana R.

Jon G.

Alex W.

Mr. K.

Mrs. W.

Mr. W.


Members Attending Next Meeting:

Brianna M.

Ciana R.

Alex W.

Jon G.

Mr. W.

Mrs. W.

Mr. K.
 Tasks Completed

  • Using same idea as yesterday, but now using wheels instead of tubing
  • Determined angle to be 50 degrees
  • Determined height from ground, 1 1/2" which worked much better than 2"
  • speeed of wheels

Tasks In Progress

  • Finding shapes for frame
  • Roughing up tires with sandpaper to increase coefficent friction
  • Telescope vs. folding for starting configuringtion

Tasks to Complete

  • tbd

Materials Needed

  • tbd