2011:Controls 1.20

From 1511Wookiee
Revision as of 16:49, 20 January 2011 by ElectricalControls (talk | contribs)
Jump to navigationJump to search

Attendance

Start time: 6:30

End time: N/A

Members present: J.P, Crystal, Gafei, Quinten, Josh

Members Attending Next Meeting:

Tasks Completed

  • task
    • sub-task
    • sub-task
  • task

Tasks In Progress

  • task- Potential portability of control system (possibly two sections fold up in vertical postion with a sheet metal sheath covering the middle)
    • sub-task
    • sub-task
  • task- Measurments for control base

Tasks to Complete

  • task- Spacial design of conrol system (which functional devices go where on the interface)
    • sub-task
    • sub-task
  • task-Materials to use for the control system (metal, circutry, etc...)

Materials Needed

  • task
    • sub-task
    • sub-task
  • task