2011:Drivetrain 2.1

From 1511Wookiee
Revision as of 18:40, 1 February 2011 by Mechanical1 (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigationJump to search

Attendance

Start time:

End time:

Members present:

Members Attending Next Meeting:

Tasks Completed

  • Drive train is complete with wheels, spacers and chain tensioned.  3/4" wood cut for bumpers.  Front and rear pieces cut 5" high by 28.5", side pieces cut 5" high by 37".  Mounting points are in the center of the channel frame 3/8" dia holes.  Bottom edge of the wood is 1.375" off the floor.
    • Using oversize channel (1.25" ID) sections as capture the frame channel and act as washers.  These sections stay with the bumpers and add no weight to the robot. 
    • sub-task
  • task

Tasks In Progress

  • task
    • sub-task
    • sub-task
  • task

Tasks to Complete

  • anchor the "T" nuts in the wood and glue the pool noodles
    • Front and rear have not been drilled waiting for final arm achcor points to be determined
    • sub-task
  • task

Materials Needed

  • task
    • sub-task
    • sub-task
  • task