2011:Field 2/1/2011

From 1511Wookiee
Revision as of 13:39, 2 February 2011 by Mechanical1 (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigationJump to search

Members present: Shayna, Manuel, Jason, Kieren, Amy


Members Attending Next Meeting:




Tasks Completed:

Task 1 - Cut Feeder station openings

Task 2 - Cut plywood bottoms for element sections of walls



Tasks In Progress:

Task 1 - Widen holes for alliance wall bolts

Task 2 - Attach feeder station slots to walls

Task 3- Attach plywood bottoms for element section of walls.


--------------------------------------------------------------------------------

Tasks to Complete:

Task 1 - Build storage bin for 2x4's

Task 2 - Determine new field rail connections




Materials Needed:


Item 1 - See shopping list



Images & Additional Updates:

(Make sure you are in the Rich Editor and use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size)