Attendance
Start time: 6PM
End time: 9:30
Members present: Crystal, Gafei
Members Attending Next Meeting:
Tasks Completed
- Completed a dry fitting with the existing components (LED matrix, potentiometers, keypad) on the metal board
- Filed down triangle, square, and circle buttons so it would fit into the hole
- Filed down keypad edge and the keypad edge on the sheet metal to make a better fitting
- Filed down triangle, square, and circle buttons so it would fit into the hole
- Painted the sheet metal red and black with spray paint (it's stripy!)
Tasks In Progress
- Watching paint dry.
Tasks to Complete
- Add velcro to the sheet metal where it would secure the classmate
- Finish soldering/documenting the cable output from the keypad into the cypress board.
- Fix the broken GND connection on the LED matrix. (One black wire was disconnected)
Materials Needed
- The correct screws?
- Velcro